Engineering & construction machineryinfo@wodetec.com/+86-19939106571
Wode Heavy Industry

Integrated grout preparation and pumping.

The WGP1200/1200/2×75/100PI-E combines high-speed mixing, slurry circulation, agitation and twin grout pumps for tunnel grouting. PLC control supports adjustable water, cement and additive proportions, recipe-based batching and automatic material replenishment. Automatic and manual modes allow the station to be operated according to the project workflow.

Specifications at a glance.

WGP1200/1200/2×75/100PI-E · Technical specifications
ModelWGP1200/1200/2×75/100PI-E
Mixer capacity1200 L
Agitator capacity1200 L
Grout pump quantity2 sets
Water/cement ratio0.5–1
Agitator power3.0 kW
Circulation pump power15 kW
Circulation pump speed1800 rpm
Circulation pump flow850 L/min
Screw feeder power7.5 kW
Screw feeder delivery40 t/h
Water tank capacity950 L
Water pump50ZX20-30 (4.0 kW)
Water pump flow / head20 m³/h / 30 m
Additive tank capacity150 L
Additive pump25SFBX-8 (0.25 kW)
Additive pump flow / head2 m³/h / 8 m
Air compressorV-0.25/8 (2.2 kW)
Air compressor exhaust volume0.25 m³/min
Grout pump modelGGH75/100PI-E
Piston diameter100 mm
Piston stroke150 mm
Low-pressure operating range0–50 bar at 0–75 L/min
High-pressure operating range0–100 bar at 0–40 L/min
Grout pump power (source-listed)11 kW
Dimensions excluding screw feeder (L × W × H)4770 × 2250 × 2370 mm
Weight3880 kg

This PI-E model has dimensions of 4770 × 2250 × 2370 mm, circulation power of 15 kW and weight of 3880 kg. Pump ranges are separate duties; confirm whether the source-listed 11 kW refers to each pump before final electrical design. Cabinet and certification requirements must be checked for the supplied configuration.

Mixing, control and grout delivery.

01

Recipe-based batching

PLC control supports adjustable material proportions and automatic configuration of the mix.

02

High-speed mixing

Vortex mixing disperses water and cement before transfer through the grout system.

03

Automatic replenishment

The station supports automatic material replenishment during the preparation sequence.

04

Automatic and manual operation

Two operating modes allow the operator to match the process to the site workflow.

05

Separate supply systems

Dedicated water and additive tanks support recipe preparation, with an air compressor for pneumatic requirements.

06

Twin grout pumps

Two pumps provide selectable operating ranges for different pressure and flow requirements.

Match the plant to the project.

  • Tunnel construction

    Grout preparation and injection for tunnel lining and TBM-related grouting.

  • Waterproofing and plugging

    Grouting where an engineered design calls for waterproofing or sealing.

  • Foundation and rock reinforcement

    Slurry injection for assessed foundation or rock-layer treatment.

  • Gap filling

    Grout production for specified void and gap-filling work.

Application areas; suitability and the grouting design require project-specific engineering assessment.

Define your working conditions.

Specify your grout recipe, required pumping duty, site layout and available power supply when requesting a project configuration.

Discuss your requirements ↗

LET’S DISCUSS YOUR REQUIREMENTS

Tell us about your project.

Material. Flow. Pressure. Power supply. Destination.

Request a quote

info@wodetec.com