Engineering & construction machineryinfo@wodetec.com/+86-19939106571
Wode Heavy Industry

Integrated grout preparation and pumping.

The WGP1000/2×75/100PI-E combines a high-speed mixer, circulation pump and grout pumps for cement slurry preparation and injection. Load cells and PLC control support recipe-based water, cement and additive dosing. Automatic and manual modes allow material proportions to be adjusted, with automatic configuration and replenishment of materials.

Specifications at a glance.

WGP1000/2×75/100PI-E · Technical specifications
ModelWGP1000/2×75/100PI-E
Mixer capacity1000 L
Maximum mixing capacity10 m³/h
Grout pump duty2 × 75 L/min at 5 MPa
Water/cement ratio0.5–1
Circulation pump power15 kW
Circulation pump speed1800 rpm
Circulation flow1100 L/min
Screw feeder power7.5 kW
Screw feeder delivery50 t/h
Water pumpISW50-160 (2.2 kW)
Water pump flow / head8.3 m³/h / 30.2 m
Additive pumpISW50-125 (0.25 kW)
Additive pump flow / head2 m³/h / 10 m
Air compressorVA80-3KW
Air compressor exhaust volume0.3 m³/min
Power supplyThree-phase 380 V, 50 Hz
Dimensions excluding screw feeder (L × W × H)3600 × 2060 × 2520 mm
Weight2820 kg

The pump rating is reproduced as two pumps at 75 L/min each at 5 MPa. No higher-pressure duty is inferred from the model name. Overall dimensions exclude the screw feeder. Electrical cabinet and certification suitability should be confirmed for the supplied configuration.

Mixing, control and grout delivery.

01

Recipe-based control

Load-cell measurement and PLC control support adjustable water, cement and additive proportions.

02

Automatic and manual modes

Operators can choose automatic batching or manual control to suit the work sequence.

03

High-speed mixing

A vortex mixer rapidly disperses water and cement before slurry transfer to the grout pumps.

04

Material replenishment

The system supports automatic material preparation and replenishment.

05

Integrated supply systems

A screw feeder, water pump, additive pump and air compressor form part of the source-listed station configuration.

Match the plant to the project.

  • Transport infrastructure

    Cement slurry preparation and grouting for highways and railways.

  • Hydropower and foundations

    Surface and underground construction requiring engineered grout injection.

  • Construction and mining

    Grout mixing and pumping for construction sites and mine works.

Application areas; suitability and the grouting design require project-specific engineering assessment.

Define your working conditions.

Specify your grout recipe, required pumping duty, site layout and available power supply when requesting a project configuration.

Discuss your requirements ↗

LET’S DISCUSS YOUR REQUIREMENTS

Tell us about your project.

Material. Flow. Pressure. Power supply. Destination.

Request a quote

info@wodetec.com