Engineering & construction machineryinfo@wodetec.com/+86-19939106571
Wode Heavy Industry

Integrated grout preparation and delivery.

The WGP100/150/20PI-E combines a high-speed colloidal mixer, agitator and vertical hydraulic grout pump on one frame. Water, cement or bentonite is mixed into slurry, transferred to the agitator and pumped to the application. A single-piston double-acting arrangement supports delivery, with separate operating duties for higher flow or higher pressure.

Specifications at a glance.

WGP100/150/20PI-E · Technical specifications
ModelWGP100/150/20PI-E
Mixer volume100 L
Agitator volume150 L
Maximum listed pump pressure100 bar
Pump duty — higher flow20 L/min at 43 bar
Pump duty — higher pressure10 L/min at 100 bar
Mixer speed1500 rpm
Mixer motor power5.5 kW
Agitator speed36 rpm
Agitator motor power1.5 kW
Pump motor power5.5 kW
Pump typeVertical hydraulic single-piston double-acting
Maximum particle size5 mm
Dimensions (L × W × H)2200 × 1000 × 1850 mm
Weight900 kg

The 20 L/min at 43 bar and 10 L/min at 100 bar conditions are separate pump duties. Confirm material compatibility, required recipe and pipeline resistance for the intended application.

Mixing, control and grout delivery.

01

Compact integrated plant

The mixer, agitator and vertical pump share one base frame.

02

Colloidal mixing

High-speed mixing disperses cement or bentonite before transfer to the agitator.

03

Two pump duties

The hydraulic pump supports separate flow and pressure conditions.

04

Hydraulic relief

The system releases pressure safely when the pumping line is blocked.

05

Operator access

A lower mixer charging height and compact layout support site operation.

Match the plant to the project.

  • TBM backfilling

    Cement or compatible fine-cement grout preparation for assessed backfill work.

  • Anchors and contact injection

    Grouting of anchors, soil nails, tension cables, sleeve pipes, rock and contact interfaces.

  • Bentonite slurry delivery

    Preparation and pumping for microtunnelling and pipe jacking.

Application areas; suitability and the grouting design require project-specific engineering assessment.

Define your working conditions.

Specify your slurry recipe, required pumping duty, site layout, delivery distance and available power supply when requesting a configuration.

Discuss your requirements ↗

LET’S DISCUSS YOUR REQUIREMENTS

Tell us about your project.

Material. Flow. Pressure. Power supply. Destination.

Request a quote

info@wodetec.com